Viewing 12 results ...

Del Solar, P, Del Río, M, Villoria, P and Nadal, A (2016) Analysis of Recurrent Defects in the Execution of Ceramic-Coatings Cladding in Building Construction. Journal of Construction Engineering and Management, 142(04).

Du, J, El-Gafy, M and Zhao, D (2016) Optimization of Change Order Management Process with Object-Oriented Discrete Event Simulation: Case Study. Journal of Construction Engineering and Management, 142(04).

Jordan Srour, F, Kiomjian, D and Srour, I M (2016) Learning Curves in Construction: A Critical Review and New Model. Journal of Construction Engineering and Management, 142(04).

Kim, C, Kim, T, Lee, U, Cho, H and Kang, K (2016) Advanced Steel Beam Assembly Approach for Improving Safety of Structural Steel Workers. Journal of Construction Engineering and Management, 142(04).

  • Type: Journal Article
  • Keywords: Advanced steel beam assembly approach; Self-supported steel joint; Automated wire control machine; Safety improvement; Construction materials and methods;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001090
  • Abstract:
    This study describes an advanced steel beam assembly approach to improve the safety of structural steel workers compared with that of the conventional process in construction. The approach uses a self-supported steel joint that changes the shape of existing steel members, an automated wire control machine that supports the assembly process, and control by a worker on the work floor. Development procedures consisted of the following steps: (1) setting up the development direction, (2) designing and producing the prototypes, (3) assessing the proposed approach through mock-up tests and modifying the prototypes, and (4) verifying the proposed approach through field application at a pilot project site. Overall, the time and cost to assemble beams in the pilot project site were reduced by 3 days and $1365.32, respectively. In particular, safety was improved by 82.35% compared with the conventional process. The proposed approach is expected to be a practical alternative providing improved safety of the steel beam assembly process. Furthermore, development procedures involved in this study may be useful to researchers interested in developing advanced construction methods.

Larsson, J, Lu, W, Krantz, J and Olofsson, T (2016) Discrete Event Simulation Analysis of Product and Process Platforms: A Bridge Construction Case Study. Journal of Construction Engineering and Management, 142(04).

Lucko, G and Kaminsky, J A (2016) Construction Engineering Conference and Workshop 2014: Setting an Industry–Academic Collaborative Research Agenda. Journal of Construction Engineering and Management, 142(04).

Mirzadeh, I and Birgisson, B (2016) Evaluation of Highway Projects under Government Support Mechanisms Based on an Option-Pricing Framework. Journal of Construction Engineering and Management, 142(04).

Shen, X and Marks, E (2016) Near-Miss Information Visualization Tool in BIM for Construction Safety. Journal of Construction Engineering and Management, 142(04).

Szentes, H and Eriksson, P E (2016) Paradoxical Organizational Tensions between Control and Flexibility When Managing Large Infrastructure Projects. Journal of Construction Engineering and Management, 142(04).

Wang, T, Tang, W, Qi, D, Shen, W and Huang, M (2016) Enhancing Design Management by Partnering in Delivery of International EPC Projects: Evidence from Chinese Construction Companies. Journal of Construction Engineering and Management, 142(04).

Xiong, W, Zhang, X and Chen, H (2016) Early-Termination Compensation in Public–Private Partnership Projects. Journal of Construction Engineering and Management, 142(04).

Zhang, L and El-Gohary, N M (2016) Discovering Stakeholder Values for Axiology-Based Value Analysis of Building Projects. Journal of Construction Engineering and Management, 142(04).